GTPP-300 gas turbine modular heat-and-power plant for electric (350 kWatt) and thermal energy generation (0.6 gCal/h). It is meant for self-contained power supply by electric energy and heat of industrial and domestic objects:

-         separate multiple dwellings (up to 100 flats)

-         health centers/pensions

-         distant villages

-         oil and gas fields

-         timber and woodworking industry enterprises.

The plant may be used both permanent and reserve, installed parallel to the existed power system, in case of emergency.

Peculiarities

 

TA18-100 the modern gas turbine aeroengine is used as a driving gear, providing 25,000 hours life time on the engine hot part having the total life time of 100,000 hours.

The plant efficiency at electric energy module use is 24%, at the use of thermal energy generation module 86%.

The electric power plant may be assembled by one or two containers (6x2.33x2.61 m and x.33x2.41) or installed on the existed grounds of the Customer.

 

                                    Main performance attributes*:

Effective efficiency (electric energy)

86%(24%) 

Fuel rate, kg/h

94,6 

Fuel (aviation kerosine, diesel oil, gas condensate)

liquid

Weight, ton

about 8

Adverse emissions rate:

 

NOx,ppm

30

COx, ppm

17

CH, ppm

36

Plant dimensions:

 

    - Electric module, m

    - Thermal module, m 

3,91,21,6 

4,92,151,5

 

According to electric energy:                                                          

Power rating, kWatt....................................................315 

Rated voltage, Watt....................................................400

Current nature......................alternating,three-phase

Frequency rating, Hz.....................................................50

Generator rotational speed, sp/h..............................1500

 

According to thermal energy:

 

Rated heating efficiency, kWatt (gCal/h).........650 (0.56)

Water height, m..............................................................90

Working pressure, kilogram force/cen2.........................6

Inlet minimum temperature, ºC........................................5

Inlet maximum temperature, ºC.....................................95

 

Operating conditions:

 

Above sea level altitude , m.............................up to 1.500

Ambient air temperature, ºC.................................-40...+45

 

*This is evaluation unit. The project is on the stage of investors searching.

 

Send request

If you are interested in receiving of additional information about "SPE "Aerosila" JSC, please ask us a question by filling in a form.

We will necessarily contact you and answer your request.
Production
Name
Company
E-mail
Telephone
Text of request
   All rights reserved © 2005.
Address: 6, Zhdanov Str., Stupino,
Moscow region, Russian Federation, 142800,
Tel.: (496) 642-33-30 Fax: (496) 642-04-24
Email: vint@aerosila.ru